Factory Price High Efficiency Clean Room Door Swing Door for Cleanroom

Still deciding? Get samples of $ !
Order Sample

Product Description

Basic Information
Model NO.
SHPSWD-1
Material
Steel
Style
Modern
Open Style
Swing
Screen Netting
Nylon
Surface
Finished
Certification
CE, ISO9001
Noise
40-60db
Core Material
Aluminum / Paper Honeycomb
Glass Type
Acrylic / Tempered Glass
Product Description
Introduction: Cleanroom doors are essential for all levels of purified rooms, dust-free rooms, and sterile environments. They feature double-sealing, heat preservation, and insulation properties. Options include swing doors (single/double) and sliding doors with customizable materials like sandwich panels or stainless steel.
Key Characteristics: Meets GMP design and safety requirements. Features high-quality 304 stainless steel hinges, automatic lifting sealing strips for air tightness, and multiple control modes including swipe cards, fingerprints, or remote control.
Product NameModular Airtight Cleanroom Door
Door Size1M - 2M or Customized
Door Thickness50mm
WindowDouble-layer Tempered Glass / Clear Acrylic
ApplicationsHospital, Pharmaceuticals, Food Factory, Cold Storage
Detailed Product Photos
Product Display
Certifications & Global Presence
Frequently Asked Questions
Q1: What types of cleanroom doors do you offer?
We provide a wide range of options including Swing Doors (Single, Double, Unique Leaf), Electric Sliding Doors, and Fast Rolling Doors tailored for pharmaceutical and industrial use.
Q2: What materials are used for the door core and surface?
The face sheets can be made of Stainless Steel 304/201 or Galvanized steel. For the internal core, we offer Aluminum Honeycomb, Paper Honeycomb, or Polyurethane foam.
Q3: How do you ensure the air tightness of the doors?
Our doors utilize high-quality lifting rubber strips and full-perimeter gasketing. This design ensures maximum air tightness and meets strict GMP standards.
Q4: What is the standard lead time for orders?
For standard products, the lead time is approximately 10 days. For full cleanroom projects including AHU systems, the lead time is around 35 days.
Q5: Do you provide validation documentation?
Yes, we provide a complete set of documentation including DQ, IQ, OQ, PQ, as well as FAT/SAT reports and operation manuals.
Q6: What is the warranty period for your products?
We offer a 2-year warranty from the date of project completion. We provide replacement parts and technical support during this period.

Related Products